Project Image
/images/case-studies/agriculture-theni.jpg
Agriculture — Targeted Spraying, Theni
50-acre cotton farm achieved 30% reduction in pesticide usage while improving coverage uniformity.
Challenge
Manual spraying was inconsistent and labor-intensive, leading to pest resistance and chemical waste.
Solution
Deployed agribot with GPS-guided variable rate application for precision targeting.
Results
- 30% reduction in chemical usage
- 25% faster application time
- Improved crop health and yield
- Zero operator chemical exposure
Project Image
/images/case-studies/solar-tirunelveli.jpg
Solar — Utility‑Scale, Tirunelveli
100MW solar plant inspection identified 47 critical hotspots, leading to 12% yield recovery.
Challenge
Manual inspections were slow and missed hidden defects, causing ongoing performance losses.
Solution
Thermal drone inspection with AI-assisted defect detection and priority classification.
Results
- 47 critical hotspots identified
- 12% energy yield recovery
- Inspection completed in 3 days vs. 2 weeks manual
- Detailed maintenance roadmap delivered
Project Image
/images/case-studies/construction-chengalpattu.jpg
Construction — Volumetrics, Chengalpattu
25-acre construction site volumetric analysis delivered in 36 hours with 8mm accuracy.
Challenge
Traditional surveying methods were too slow for weekly progress tracking needs.
Solution
Weekly drone surveys with automated volumetric calculations and change detection.
Results
- 36-hour turnaround time
- 8mm accuracy achieved
- Weekly progress reports enabled
- Reduced surveying costs by 60%